Also note that the bathroom core near the cafe us pulled away from the facade in the 3rd image (2nd white one), and is attached in the 4th and 5th. Its nice pulled away I think, but those renders were done before that was changed.
Also, heh, theres no way to get into the library at the moment so either the lecture hall north wall with have to move south, or the wall between the stacks and the house of experiments will have to move north.
5 comments:
Ive also uploaded the plan from this model as a guide. The full model is too heavy to upload.
100214 GROUND PLAN.3dm
Also note that the bathroom core near the cafe us pulled away from the facade in the 3rd image (2nd white one), and is attached in the 4th and 5th. Its nice pulled away I think, but those renders were done before that was changed.
Also, heh, theres no way to get into the library at the moment so either the lecture hall north wall with have to move south, or the wall between the stacks and the house of experiments will have to move north.
Among other things.
wow.
looks amazing.
looks fun! id actually want to go there now.
Post a Comment
Note: Only a member of this blog may post a comment.